View(s)

Successful Simulations for the Contrecœur Terminal

9 September 2025

In collaboration with the Montreal Port Authority and the Corporation of Mid-St. Lawrence Pilots (CPSLC), the MSRC is proud to have carried out the ship handling feasibility study for the Contrecœur marine terminal construction project, which led to a joint development agreement with DP World.

CPSLC pilots conducted simulations to confirm that ship manoeuvres at the new terminal could be performed safely. It’s reassuring to see that port authorities and other stakeholders in the Quebec maritime industry attach such importance to navigational safety and environmental protection.

Successful Simulations for the Contrecœur Terminal